loader image
27 Drydock Infrastructure Updates

27 Drydock Infrastructure Updates

27 Drydock Infrastructure Updates Boston, MA    Owner Related Beal  Architect ACTWO Engineer Bala Completion March 2025 The 27 Drydock Infrastructure Project involved the conversion of a portion of an existing office building into fully modernized laboratory...
Ardent Mills Wheat Heater and Air Handler Replacement

Ardent Mills Wheat Heater and Air Handler Replacement

Ardent Mills Wheat Heater and Air Handler Replacement Ayer, MA    Owner Ardent Mills Architect SmithGroup  Engineer Seaman Engineering Completion March 2025 Sterling Construction was engaged to install a new wheat heating system and replace the existing air...
UMass Chan Medical School Penthouse

UMass Chan Medical School Penthouse

UMass Chan Medical School Penthouse  Worcester , MA Owner UMass Chan Medical School Architect Cannon Design Engineer Simpson Gumpertz and Heger  Completion May 2025  With a 60-year-old building aging beyond its useful life span, UMass Chan Medical School developed a...
UMass Tsongas Center HVAC Replacement

UMass Tsongas Center HVAC Replacement

UMass Tsongas Center HVAC Replacement Lowell, MA   Owner UMass Lowell Architect Icon Architecture Engineer RFS Engineering Completion August 2024  This HVAC improvements project includes replacement of existing rooftop mechanical equipment supporting the Tsongas...
451D Infrastructure Improvements Phase 1 & 2

451D Infrastructure Improvements Phase 1 & 2

451D Infrastructure Improvements Phase 1 & 2  Boston , MA Owner Related Beal  Architect ACTWO Engineer Bala Consulting Engineers Completion Phase 1: 2020Phase 2: 2024  This project included design-assist and construction services to complete infrastructure...